WTM.

Infrastructure Case Study 02 · I.I. Chundrigar Road, Karachi, Sindh

Karachi Stock Exchange (PSX) (50,000 m²)

World Trade Management (WTM), Karachi supplied and specified 50,000 m² of Porcelain Tile & High-Traffic Safety Systems for Pakistan Stock Exchange (PSX) Infrastructure Division at I.I. Chundrigar Road, Karachi, Sindh (completed 2022).

Project Specification Summary

Client / OperatorPakistan Stock Exchange (PSX) Infrastructure Division
Site LocationI.I. Chundrigar Road, Karachi, Sindh
Supplied Area50,000 m²
Completion Year2022
Scope of SupplyPorcelain Tile & High-Traffic Safety Systems
Technical SpecificationISO 13006 Group BIa full-body technical porcelain (PEI Class V abrasion resistance, R10 wet slip rating, 600×600 mm rectified format).
Supplying EntityWorld Trade Management (WTM), DHA Phase 2 Extension, Karachi

01 · Operational Challenge

Site & Duty Conditions

Replacing legacy multi-story trading and administrative floors in Karachi's humid coastal financial district while maintaining active building operations and strict fire/slip safety compliance.

02 · WTM Specification

Material & Bedding System

WTM engineered a phased night-shift supply schedule from our DHA Karachi warehouse, delivering batch-matched BIa vitrified porcelain and stair-nosing safety treads with 48-hour call-off turnaround.

03 · Verified Outcome

Long-Term Performance

50,000 m² installed with uniform shade calibration and certified slip resistance across lobbies, lift cores, and office plates.

Other WTM Reference Projects

Related Technical Specification Guides